Concrete Post-Tensioning
It is a mechanical process used in construction and designed for increasing the tensile capacity of the concrete by introducing a compressive stress of a pre-determined magnitude into a structural member which is obtained by stressing high-strength steel strands, which pass through the galvanized steel pipes inside the concrete and locking them.The process of stressing the steel strands in the post-tensioning is made after pouring the concrete, it differs from other pretensioned system in this respect
Why Use It
- Cost Efficiency
- Structural Durability
- Faster Construction
- Reduced Maintenance
- Design Flexibility
- Sustainability
Where to use It
- Towers
- houses
- hospitals
- Hotels
Projects
Al Asalah University 1
DURATION : 6 MONTH
Al Asalah University 2
DURATION : 4 MONTH
InterContinental Hotel – Al Qara’a
DURATION : 6 MONTH
Royal Tower 3
Under Construction
Judya Residential Tower
DURATION : 5 MONTH
B-FIT Gym
Under Construction
Towlan Grand Hotel
DURATION : 6 MONTH
Solidere Mall
DURATION : 4 MONTH
Al-Falah Building
DURATION : 2 MONTH
Fish Market
DURATION : 1 MONTH
Private residential building
DURATION : 6 MONTH
