Concrete Post-Tensioning
It is a mechanical process used in construction and designed for increasing the tensile capacity of the concrete by introducing a compressive stress of a pre-determined magnitude into a structural member which is obtained by stressing high-strength steel strands, which pass through the galvanized steel pipes inside the concrete and locking them.The process of stressing the steel strands in the post-tensioning is made after pouring the concrete, it differs from other pretensioned system in this respect
Why Use It
- Cost Efficiency
- Structural Durability
- Faster Construction
- Reduced Maintenance
- Design Flexibility
- Sustainability
Where to use It
- Towers
- houses
- hospitals
- Hotels
Projects
Commercial Building
DURATION : 2 MONTH
Ghornata Commercial Building
DURATION : 3 MONTH
Tuwaiq Oasis
DURATION : 7 MONTH
Boulevard Fitness Time – Al A’aridh
DURATION : 6 MONTH
Ewan Tower
DURATION : 6 MONTH
Al Sahafa International School
DURATION : 3 MONTH
On Off Caffee Laban suburb
DURATION : 1 MONTH
Royal Tower 2
DURATION : 6 MONTH
Mazaya Tower
Under Construction
Jawharat Al-Majd
DURATION : 6 MONTH
Charitable Society for Qur’an Memorization Buildings Complex
DURATION : 6 MONTH
